Zepth Core · Document Management

What is a CVI (Confirmation of Verbal Instruction)?

A written record, sent by the contractor, of an instruction that was given verbally. Under JCT it has real legal effect: the contractor confirms in writing, and the instruction takes effect if the architect does not dissent within the stated period. Under FIDIC 2017 an instruction is written by definition — so an unconfirmed verbal direction has no contractual status at all.

Why it exists

Verbal directions happen on every site on earth, every day. Somebody senior points at something and says do it this way instead. The crew does. Nobody writes anything down.

The CVI is the mechanism that converts that moment into something that exists contractually. Without it, under FIDIC, the work you did on the strength of a verbal instruction is work you have donated — there is no instruction, so there is nothing to value.

How the JCT mechanism works

An oral instruction under JCT has no immediate effect. The contractor confirms it in writing, and if the architect does not dissent within the stated period, the instruction takes effect from the end of that period.

Note who carries the burden: the contractor. The person who received the instruction is the person who must write it down. Waiting for the other side to paper their own instruction is a strategy with a long and unhappy history.

The cheapest insurance on site

Confirming a verbal instruction takes a couple of minutes. Not confirming it can cost the value of the work, and occasionally a great deal more than that if the work also caused delay.

So the habit worth building is unconditional: confirm everything, immediately, in writing. Not the important ones — everything. The instruction that turns out to matter is rarely the one that looked like it would.

In the guides

Terms

References

  • module: /modules/site-instructions/ — JCT confirmation of verbal instructions; FIDIC 2017 (effects described, clause text not reproduced)

Zepth is the construction project delivery platform — it runs construction, procurement and asset management on one record, and does the work: reading the drawings, reviewing the submittals, matching the invoices and flagging the risks, with a human sign-off on anything consequential.

See Zepth on your project.

A short, tailored walkthrough on your real workflow — no generic demo.

Book a meeting